A-A-20070D
The sample shall be prepared by grinding or blending the product in a minimum time to uniformity,
6.3 Analytical testing. When specified in the solicitation, contract, or purchase order, analyses shall be in accordance with the following methods from the Official Methods of Analysis of the AOAC International.
Test Method
Moisture (Dehydrated peppers) 934.06
Sulfite 990.28, 990.31 1/
1/ Applies to Class 2.
6.4 Test results. The test results for moisture shall be reported to the nearest 0.1 percent. The test results for sulfite content for Class 1 shall be reported to the nearest 100 ppm and Class 2 shall be reported to the nearest ppm. Any result not conforming to the analytical requirements shall be cause for rejection of the lot.
7. MANUFACTURER'S/DISTRIBUTOR'S PRODUCT ASSURANCE. The manufacturer/ distributor shall certify that the dehydrated peppers provided shall meet the salient characteristics of this CID, conform to their own specifications, standards, and quality assurance practices, and be the same dehydrated peppers offered for sale in the commercial market. The purchaser reserves the right to require proof of conformance.
8. REGULATORY REQUIREMENTS. The delivered dehydrated peppers shall comply with all applicable Federal, State, and local mandatory requirements and regulations relating to the preparation, packaging, labeling, storage, distribution, and sale of dehydrated peppers within the commercial marketplace. Delivered product shall comply with all applicable provisions of the Federal Food, Drug, and Cosmetic Act, the Fair Packaging and Labeling Act, and regulations promulgated thereunder. The dehydrated peppers shall comply with the allergen labeling requirements of the Federal Food, Drug and Cosmetic Act.
9. QUALITY ASSURANCE PROVISIONS. Purchaser shall specify 9.2 or 9.3; purchaser may specify 9.1 with 9.1.1 or 9.1 with 9.1.2.
9.1 Manufacturer's quality assurance. When required in the solicitation, contract, or purchase order, the product manufacturer shall be required to provide evidence, by certificate, that the manufacturing plant has undertaken one of the following quality assurance measures within 12 months prior to providing a bid, or no later than 10 business days from the date of awarding of
the contract. Failure to provide this documentation within the proper time frame may result in the contract being terminated for cause.
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business